Home / Curtain Walls
SPECIMEN R-03 · CURTAIN WALLS

Curtain Walls, Specified by System Code

Twenty-two curtain wall lines under five YK system codes — with the glass builds and frame parameters the catalogue records for the range.

Curtain Walls, <em>Specified by System Code</em>
CATALOGUE SPECIMEN R-03 — curtain wall, supplier catalogue photo

01The System Codes

System codeSystem family (as catalogued)
YKFC001Framed curtain wall system
YKDC001Curtain wall system, double-skin family listings
YKUC001Unitised curtain wall system
YKPC001Curtain wall system, panel family listings
YKHC001Curtain wall system, hidden-frame family listings

Twenty-two curtain wall lines sit under these five codes. The system family names above follow the catalogue's listing order; the build parameters the catalogue records for the range are the substantive content, and they follow.

02Recorded Build Parameters

ParameterCatalogue record
Glass coloursClear · blue · grey · green · brown
Single glass6 / 8 / 10 / 12 mm
Laminated build5 + 0.38 / 0.76 / 1.52 PVB + 5
Insulated build6 + 6A / 9A / 12A / 27A + 6
Aluminium thickness2.5 – 3.0 mm
Frame depth90 – 150
Surface treatmentsPowder coating · anodised · PVDF

A curtain wall is an engineered system, and its project specification — wind load, thermal and acoustic performance, the local code's requirements — is set by the project's engineers and confirmed against the system at quotation. The parameters above are the catalogue's recorded option space: the glass builds and frame sections the range is offered in. Engineering documentation for the system in a project schedule is available upon request during quotation.

QBuyer Questions

Are curtain walls quoted as systems or panels?

As systems: the code identifies the system, and the quotation builds it out — glass build, frame sections, surface treatment, panel schedule from the elevation drawings. Send elevations with the enquiry.

Which system code suits a unitised façade?

YKUC001 is the unitised family in the catalogue's system codes. System selection is an engineering decision made with the project's façade requirements on the table — the schedule records the code chosen.

Can façade lines ship with interior fit-out?

They can consolidate, but façade programmes usually run on the construction schedule rather than the fit-out schedule; the logistics plan should treat them as their own stream. Discuss the phasing at quotation.

What documentation supports a façade specification?

System documentation is available upon request during quotation. Performance requirements belong to the project's engineers; the supplier's documents evidence the system offered.

Working on a project materials list?

Send the BOQ, drawings or room schedule. The team replies with a materials schedule, per-item quotation and the certificates available for the items on your list.

Send Your Project BOQ