SPECIMEN A-00 · FULL RANGE

Building Materials Manufacturer for Project Buyers

One supplier, one materials schedule, one consolidated shipment. Yekalon Industry Inc. has supplied building materials from Shenzhen since 1997 — flooring, hotel furniture, whole-house furniture and construction materials quoted line by line against your BOQ.

Building Materials Manufacturer for <em>Project Buyers</em>
CATALOGUE SPECIMEN H-00 — guest-room furniture set, supplier catalogue photo

01One List, One Supplier, One Shipment

Project materials buying usually fails in the gaps: the flooring comes from one factory, the guest-room furniture from another, the vanities from a third — and the site team inherits three lead times, three packing standards and three arguments. This site exists to close those gaps. Yekalon Industry Inc. is a building materials manufacturer and one-stop supplier whose catalogue runs from engineered wood flooring to hotel furniture sets, wardrobes, bathroom vanities, doors, windows and curtain walls — 1,320 catalogue lines across eleven ranges, quoted as a single materials schedule for a single project.

The company was founded in 1997 in Shenzhen and today works with 607 employees across four brands: Yekalon Buildmart for project building materials, Bergeim Floors for flooring, Tap&Go for its patented click-lock flooring technology, and Sennorwell for sanitary ware and tile. The company profile states its materials reach buyers in 150+ countries; what matters more for your order is the working method — send a BOQ, get a schedule, approve it line by line.

1997Founded in Shenzhen — company and platform records agree
1,320Catalogue lines across eleven building materials ranges
607Employees, per the company's verified supplier profile
150+Countries served — company profile states

02The Three Ranges Projects Are Built From

Engineered wood flooring
SPECIMEN F-00

Flooring

213 flooring lines: engineered and solid wood, click-lock laminate, SPC and vinyl, bamboo and WPC decking — headed by the Bergeim Floors range and Tap&Go locking.

Hotel furniture set
SPECIMEN H-00

Hotel Furniture

Guest-room sets, beds, sofas and casegoods for hotels and serviced apartments, quoted as complete rooms or as an FF&E package with the rest of your list.

Walk-in closet wardrobe
SPECIMEN W-00

Whole-House Furniture

Wardrobes and walk-in closets, bathroom vanities and kitchen cabinetry in coordinated finishes, so joinery arrives as one package instead of five.

Beyond the three pillars, the same order can carry the construction ranges — curtain walls, doors and windows, railings and staircases, sanitary ware and stone and tile — through the full product range pages. Nothing on this site is priced online, on purpose: project materials are quoted against quantities, sizes and finishes, and a list price would mislead more than it helps.

03How a Project Order Runs

  • Send the list. BOQ, drawings, a room schedule or a spreadsheet — whatever your project already has.
  • Receive a materials schedule. Your list comes back organised by range, with per-item quotations and substitution options where a line cannot be met as specified.
  • Approve line by line. Drop, swap or confirm each line; request the certificates that match the exact items before payment.
  • Consolidate and ship. The company's service line covers site measurement support, material recommendation, budget control, logistics and installation and engineering services — ask which of these your project needs, in writing, with the quotation.

A note on evidence: product photos on this site are supplier catalogue photos, and company scale figures are attributed to the company profile where they appear. Certificates are available upon request — the certificate page lists SGS laminate flooring certification, CE, FSC and CARB certificates.

QBuyer Questions

How do I get a quotation for a whole project?

Send the bill of quantities (BOQ), drawings or a room-by-room materials list through the contact form or to [email protected]. The team works it into a materials schedule and quotes item by item, so you can approve, drop or substitute lines before anything is ordered.

What is the minimum order quantity?

Order quantities are set per item and per project, and they are not published as a single catalogue number. Before you commit, ask for the MOQ of each line on your list in writing — small finishing items and full container loads of flooring follow different rules.

Which certificates can be supplied?

The company's certificate page lists SGS laminate flooring certification, CE, FSC and CARB certificates, among others. Certificates are available upon request — ask for the document that matches the exact product line on your order before payment.

How long does delivery take?

Production and consolidation times depend on the mix of categories in one order. Before payment, confirm the lead time for your confirmed list in writing; mixed-category orders are normally consolidated so flooring, furniture and finishing items travel together.

Working on a project materials list?

Send the BOQ, drawings or room schedule. The team replies with a materials schedule, per-item quotation and the certificates available for the items on your list.

Send Your Project BOQ